BRIDGE STREET, SWINDON - FACADE RETENTION

 

 

 

A temporary facade retention structure was required in order to preserve the existing building facade during a major redevelopment exercise of the building itself.

Due to access restrictions, it was necessary to construct the temporary facade retention inside the building, erecting the RMD slimshor components through the existing floors.

In order to resist the potential 50kN plus uplift loads, concrete kentledge was designed and supplied inside the building, with the RMD Superslim components secured using load bearing anchors.

 
   

 

The end product.

 

 
 
 
 