TEMPORARY
CANTILEVERED WALKWAY PRE-INSTALLED TO CONCRETE EDGE BEAM
TR
Services were contracted to install a two board walkway with
edge protection to a pre-fabricated RC edge beam prior to
it being installed as part of new bridge.
Hilti push-in anchors and special
scaffold fittings were used to minimise restrictions during
permanent works installation.
The walkway was installed at
ground level prior to the edge beam being craned into position.